Chat with us, powered by LiveChat

Entrance Upgrade - Corpus Christi Catholic High School

This project involved the demolition of the existing concrete and tile entrance, due to cracked tiles and the dropped slab levels. Works involved removing a section to prepare ground and base material for new mesh reinforcement in preparation for new concrete resurfacing.equipment. Lighter colour scheme created for an illusion of a larger room and increased preparation and work area for staff and serving area.

CASE STUDY